![]() Up to £34m ($56m) was provided by Sport England through the National Lottery funding. ![]() The building was constructed with an investment of £225m ($371m approximately). "The building was completed in July 2011, in time for the games." The preconstruction works included the demolition of 11 industrial buildings and use of 140,000t of soil sourced from outside the project site. A former life as an Olympic swimming centreĬonstruction works on the London Aquatic Centre began in July 2008 and the building was completed in July 2011, in time for the games. The building now provides a total seating capacity of 2,500, which is expandable to 3,500 by adding temporary seats. The building is now fitted with glass on both sides, the area where the two seating stands were located. GLL, a charitable social enterprise, operates the building on behalf of London Legacy Development Corporation. The LAC is located at the entrance to the south of Queen Elizabeth Olympic Park, providing direct access to the Stratford City Bridge. The temporary attached structures to the building, built specifically to accommodate 17,500 spectators for the event, were removed and major modifications were made to the building. Alle Schwimmbecken verfügen über höhenverstellbare Böden und Unterteilungen.London Aquatics Centre (LAC), which played host to the London Olympics 2012, with its two swimming pools and a diving pool, was opened for public use in March 2014. Für die “Legacy Mode” werden diese wieder abgebaut und die Schwimmhalle wird dann von der breiten Öffentlichkeit und für nationale wie internationale Schwimmwettbewerben genutzt. Die westlich und östlich der Becken gelegenen temporären Tribünen nehmen 15 000 Zuschauer auf. ![]() Während der Spiele bestehen Tribünenplätze für 17 500 Zuschauer sowie alle damit verbundenen sonstigen räumlichen Anforderungen. Das 50-m-Aufwärmbecken liegt unter einem der Eingänge zum Olympia Park, der so genannten Plaza.ĭie ingenieurtechnischen Planungen erfolgten gemäß den unterschiedlichen Anforderungen der “Games Mode” und der “Legacy Mode” nach den Spielen. Unter einem wellenförmigen Dach befinden sich ein 50-m-Schwimmbecken sowie ein 25-m-Becken mit Sprungtürmen. Schon vor Beginn der Spiele wurde es zu einer baulichen Ikone. Schwimm-Arena der Olympischen und der Paralympischen Spiele London 2012ĭie Schwimm-Arena ist eines der Hauptgebäude der Olympischen wie auch der Paralympischen Spiele in London 2012. ![]() In the legacy mode the building temporary seating will be dismantled and the building will be a permanent pool facility for the local community as well as national and international swimming events beyond the Games.Įach pool tank is provided with a combination of floating floors and movable sub-division boom bulkheads to allow multiple legacy and community use. In that mode temporary stands to the east and west of the competition and diving pools will seat approx. In the Games mode the facility has a maximum gross spectator capacity of 17 500 for use for the London 2012 Games as well as housing facilities for the running of these events. The engineering strategy has been developed around two basic configurations the Games mode and Legacy Mode. A 50 m training pool is situated beneath the Olympic Park entrance plaza structure which is built integrally with the rest of the building. The building comprises a 50 m competition pool and 25 m dive pool under the wave-form roof of the main pool hall. Already now before the opening of the Games it is regarded as an iconic legacy building. The Aquatics Centre is a centrepiece of the London 2012 Olympic and Paralympic Games. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |